35 Job openings found

1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
5.00 LPA TO 6.00 LPA
  Key Roles and Responsibilities In the pharmaceutical industry, a Project Engineer's main responsibilities involve ensuring the technical work is completed safely, on time, within budget, and in compliance with stringent regulatory standards (like cGMP).  Project Planning & Execution Prepare & review project schedule, P&ID, and GA Drawing. Co-ordinate with cross functional teams. (Civil, ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
2.40 LPA TO 3.60 LPA
Roll :  Designing various electrical control panels like PLC, VFD, Soft Starter, MCC, PCC, Pneumatic, ETC  Circuit designing, preparing SLD, Panel layout & Electrical schematics.  Making BOM, selection of material as per requirement or IP protection, preparing drawings for approval    communicating with clients for understanding and detailing of drawings Supporting to other teams ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
Roll :  Designing various electrical control panels like PLC, VFD, Soft Starter, MCC, PCC, Pneumatic, ETC  Circuit designing, preparing SLD, Panel layout & Electrical schematics.  Making BOM, selection of material as per requirement or IP protection, preparing drawings for approval    communicating with clients for understanding and detailing of drawings Supporting to other teams ...
2 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.00 LPA
Installation, testing, and commissioning of electrical equipment Maintenance and servicing of LT/HT electrical systems Troubleshooting and breakdown support Site coordination and reporting Eligibility Criteria: ITI / Diploma / Degree in Electrical Engineering Basic knowledge of electrical systems Willingness to travel to sites ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 4.50 LPA
Hiring for Starch powder, liquid Glucose Manufacturing Industry Electrical Maintenance Engineer 02 Responsibilities:- Prepare specifications for process equipment Prepare Equipment installation drawings and ensure the installation of the equipment as per the same. Review drawings issued by the vendor. Complete periodic inspections of the vendor's site to check for the progress of manufacturing of the equipment Plan and ...
1 Opening(s)
12.0 Year(s) To 25.0 Year(s)
10.00 LPA TO 18.00 LPA
Hiring for the upcoming plant in Beed MH of Manufacturing Edible Oils, Refineries, Coconut Oil Post: Plant Head Level: Manager / Senior Manager Job Profile: - Planning, organizing, directing and running optimum day-to-day operations to exceed customers- expectations - Increasing production, assets capacity and flexibility while minimizing unnecessary costs and maintaining current quality standards. Job ...
1 Opening(s)
12.0 Year(s) To 25.0 Year(s)
12.00 LPA TO 18.00 LPA
Hiring for the upcoming plant in Aurangabad MH of Manufacturing  Edible Oils, Refineries, Coconut Oil Post: Plant Head Level: Manager / Senior Manager Job Details: - Planning, organizing, directing and running optimum day-to-day operations to exceed customers- expectations - Increasing production, assets capacity and flexibility while minimizing unnecessary costs and maintaining current quality ...
3 Opening(s)
0 To 3.0 Year(s)
1.80 LPA TO 3.00 LPA
Post: Automation Engineer   Education : Diploma / BE Electrical or Electronics   Experience: Min 6 Month   Salary: up to 3.00 PLA   Job Profile / Skills:    •PLC Programming, HMI & SCADA graphics development and commissioning.   •BMS System.   •Designing of GA, SLD and electrical schemes in EPlan Electric P8 & AutoCAD Electric.   •Testing and commissioning of PLC, VFD, AMF, DG synchronizing, RTCC, PCC, APFC, MCC and IMCC Panels.   •Project related technical documentation.   •Leading the team for project execution   Job Location: Waluj MIDC, Aurangabad   Bus facility available   for more details call on 9765567509 / 9765567505
10 Opening(s)
5.0 Year(s) To 8.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Profile:   Maintenance of galvanizing line. Maintenance of Maintenance of D.C. machines (up to 1600 KW DC motor.)  Maintenance of Maintenance of A.C motor (2500 KW AC motor.)  Maintenance of DC & AC Drives, power & auxiliary panels.  Maintenance of roll grinding machine Attending Breakdown maintenance & shutdown maintenance. Maintaining Safety aspects & House Keeping of the line. Maintenance of crane. Making technical Specifications and technology appraisal for plant equipment and utilities. Maintenance of Ac Drive, Dc Drive like ABB, Allen Bradley, Siemens micro Master Drive, Tele mechanique Drive BRM & WRM Electrical Maintenance Successfully completed BAR MILL Project Erection & commissioning of MCC,PCC, Transformers Drives Control wiring from RIO to Field - Proxy, HMD and solenoid valves..  Did the communication wiring & Control wiring.                                                                              MCC Control wiring & RIO'S Termination & Cabling  AC motors installation & maintenance. Encoders Cabling & Termination  OS Internal/External wiring Wiring of Siemens PLC S7-400 Handled wiring of field devices like control valves, flow meters. Looked after power cable laying & termination for power distribution panels (PCC & MCC), motors, transformers, Ac drives and HT panels. And control cables for PLC, RIO'S and various field equipment Coordinated with SIEMENS & MORGAN for Commissioning of Bar Rod Mill       Hydraulic and Lubrications motor maintenance EOT cranes & Magnetic cranes, Electrical maintenance & Troubleshooting Job Location: Chitegaon MIDC, Aurangabad Maharashtra   For more details call on 7249840333 / 9765567506   Send CV on career@paradiseplacement.co.in  
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Maintenance Shift In charge    Education: DEE / BE Electrical    Experience: Min 6 Years in Rolling Mill / Steel Industry   Job Profile: Working in a general shift, make daily job planning, manpower planning as per rolling section. Responsible for doing pm-1(preventive maintenance) jobs .shift schedule and daily checklist follow-up, Responsible for Electrical & Automation Maintenance of 600-meter long HAPL Line consist of Entry section, RCM Welder,6-HI Cold / Hot Rolling Mill, Furnace, Scale Breaker, Shot- Blaster, Pickling, Entry-Mill & Exit Loppers & exit Section. Responsible for handling all maintenance related activities of ABB PLC's,AC Drives,AC Motors and DCS 800xA System and LT and HT switch Gears used in the plant  Knowledge in logic solving in control panels & various interlocking schemes required for automation and analyzing all drawings related to automation & control systems. Instrumental in coordinating with various internal departments and contractor personnel for safe execution of shutdowns and ensuring implementation of routine/preventive/breakdown maintenance schedules of the system to increase machine uptime, equipment reliability thereby. Responsible for maintaining 5S activity & safety measures regularly To co-ordinate with the Electrical contractor for Execution, Erection, and Commissioning Basic Knowledge of Sheet CENTER GUIDE and STEERING UNIT, EDGE System provided by EMG. Knowledge of hardware Communication between Drives, PLC and HMI’s through Fiber Optic and Profibus. Knowledge of Gauge Measurement system provided by IMS used at 6 HI in Line Mill. Responsible for keeping a record of the daily power consumption, daily delay report, spare parts list of the plant. Basic Knowledge about  Control-Logix / Compact-Logix systems of Allen-Bradley PLC (Rockwell Automation). Identifying NetLinx networks for use in a Logix5000 System used for in-line Welder. Successfully  accomplished Erection, testing, Commissioning of ARP System(Acid Recovery Process To maintain records, logbook for the job carried out. Organize safety meetings & give on the Job training to my subordinates To ensure good housekeeping in the area and the shop floor. Take participate in IMS  internal audit  and prepare all supporting document To maintain a record of bypass of trip & interlock as per the procedures. Working on SAP (Plant Maintenance Module).   Job Location: Chitegaon MIDC, Aurangabad Maharashtra   For more details call on 7249840333 / 9765567506   Send CV on career@paradiseplacement.co.in

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile