6 Job openings found

1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
5.00 LPA TO 6.00 LPA
  Key Roles and Responsibilities In the pharmaceutical industry, a Project Engineer's main responsibilities involve ensuring the technical work is completed safely, on time, within budget, and in compliance with stringent regulatory standards (like cGMP).  Project Planning & Execution Prepare & review project schedule, P&ID, and GA Drawing. Co-ordinate with cross functional teams. (Civil, ...
8 Opening(s)
4.0 Year(s) To 6.0 Year(s)
6.00 LPA TO 7.20 LPA
The HVAC Draftsman will be responsible for preparing detailed HVAC shop drawings, coordinated layouts, and as-built drawings for commercial and industrial projects. The role requires strong drafting expertise, knowledge of HVAC systems, and close coordination with design engineers, BIM teams, and site execution teams to ensure drawings are accurate, coordinated, ...
1 Opening(s)
6.0 Year(s) To 9.0 Year(s)
5.50 LPA TO 6.00 LPA
The Senior Site Engineer – HVAC will be responsible for the execution, supervision, and coordination of HVAC works at project sites. The role involves managing installation activities, ensuring quality and safety compliance, and coordinating with cross-functional teams to deliver projects as per timelines and specifications. You will work closely with ...
2 Opening(s)
3.0 Year(s) To 8.0 Year(s)
6.00 LPA TO 7.20 LPA
The BIM Modeler – Revit (MEP) will be responsible for developing and maintaining accurate BIM models, preparing shop drawings, coordination drawings, and as-built models for MEP systems, with a primary focus on HVAC services. The role involves working closely with design engineers, project managers, site engineers, and other discipline BIM ...
2 Opening(s)
4.0 Year(s) To 7.0 Year(s)
5.00 LPA TO 6.00 LPA
Quality Control Engineer An MEP QC Engineer will play a critical role in ensuring the integrity and quality of HVAC, Utilities, Fire Fighting and Plumbing systems, contributing to successfully completing the construction project on time and within budget. This job description outlines the general nature and level of work expected ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
15.00 LPA TO 18.00 LPA
Key Responsibilities MEPF Design Management Lead end-to-end MEPF design development from concept stage to as built drawings Review and approve HVAC, Electrical, Plumbing, and Fire Fighting system designs • Validate engineering calculations, system sizing, and equipment selection Ensure designs are optimized for performance, safety, and cost efficiency HVAC (Mechanical) Design Oversight Chilled water systems, VRF/VRV, DX ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile