1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
10.00 LPA TO 12.00 LPA
Hiring for a Production Head for a 5-ply automated corrugated box plant in
Chhatrapati Sambhajinagar (formerly Aurangabad) typically requires candidates with strong leadership skills and deep technical expertise in automated packaging machinery
Overseeing a gamut of tasks encompassing production, PPC, quality, new developments, manpower planning, procurement/ vendor development, coordination with customers & ISO / TPM ...
4 Opening(s)
2.0 Year(s) To 10.0 Year(s)
6.00 LPA TO 9.00 LPA
Hiring for Corrugation Box Manufacturing Industry
Printing Machine Operator
Skill :
Machine Operation: Set up and operate flexographic (Flexo) printing machines, such as Topra, T1, or RS4 models.
Job Setup: Fix printing plates, adjust rollers, and configure machine parameters according to specific job requirements.
Quality Control: Monitor print quality for color accuracy, alignment, sharpness, and consistency throughout the ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 5.00 LPA
Hiring for Assistant Manager - Maintenance in Blending the Art and Science of Packaging innovatively, Company, endeavors to Packaging that stands out of the rest, as an example of excellence. From Paper to Boxes, our expertise encompasses the entire range of Corrugated Packaging.
Experience: Min 5 Years in Packaging Industries
Salary: up to 5.00 ...
1 Opening(s)
6.0 Year(s) To 15.0 Year(s)
4.00 LPA TO 6.00 LPA
JOB PROFILE:
To manage all production activity such as daily production report, shift of labor handling, MIS report to Plant Head / Production manager,
Planning and control overall production, incoming inspection of material,
Online production testing and quality test report for daily dispatch material. Audit report for BIS certificate.
To testing all online ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.40 LPA TO 3.00 LPA
Job Description:
Inspection record ( Receipt, Fpi, In process,& Final )
Shift wise Q, A details.
NCR & Deviation report.
Approved shade card.
Standard Testing procedures.
Rejection Analysis Activity.
Preparation of the daily QC Measure report
Customer visit & audit preparation
Control on final SQC activities
Pre- dispatch inspection &preparation of inspection test certificates.
Monitoring & necessary Quality records.
All lot AQL ...