1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.30 LPA
KEY RESPONSIBILITY:
Maintenance activities of hydraulics/ Robotics/electric & Mechatronic
Maintenance of injection molding machine & SPM machine
Execution of PM & PDM as per schedule, Analysis of breakdowns
Execution of TPM &PM pillar Activities
Energy saving project
Attending major breakdown maintenance
Utility includes transformer, HT/LT switchgear, Air Compressor, DG set, pump house Head over crane, chiller, cooling tower, lux measurement. Firefighting system, R.o plant
Handling documentation of executive & planned maintenance
Execution of TBM CBM as per schedule
Study of detoriotive components
Applications of kaizen
Troubleshooting and attending breakdown maintenance
Housekeeping maintenance related to department modification and spare management
Implementing ISO/TS16949, 5’s and FORMELQ
To improve machine uptime (MTBF)
To improve machine repairs time (MTTR)
Maintained machine history card
To handle electrical supply system I.e.HT &Lt side
Maintenance of hydraulic system/ pneumatic system/ to develop ladder logic of PLC, AC, DC & Servo Drive
Keeping spare in ready operational condition and maintenance of utility equipment
Preparing Machine Check List: sm 450t, sm 350, Magna150t, Magna 200t, htw90, htw60 & FOR 50TH machine
Capable of handling electromechanical device Is. robot, chiller, ultrasonic welding m/c
Presentation of monthly PRM
Taking outside service appointment & spare management
Recording Daily Activity Report for Meter Reading (main transformer, all panel) &Organize receivable &commercial
Documents against invoice
Managing maintenance of machine control panel, assembly line, plant lighting, street lighting, & all electrical work in plant as well as of communication buses RS232, RS485, DH485&Modbus
Working on welding machine, grinding machine, oil filter machine water chiller, rivet gun, hydraulic pneumatic machine, DG set, exhausts fan & dehumidifier, injection model and plastic mold
Job Location : Waluj MIDC, Aurangabad
For more details call on 9765567506
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 8.00 LPA
Job Description
Job Title
Indirect Material Sourcing Team Leader
Division/ Functions
Purchase
Direct reporting To
Manager
Qualification
B.E (Mechanical)
Experience
5-10 years
QMS Number
Sr. No.
Key Responsibilities
Description
1
Availability Assurance
Tooling , Spare parts , consumables, Commercial goods, Fixtures, Gauges, Computer peripherals , Hardware, Project related purchases and services,
2
Payments Status Follow ups
payments follow up with accounts , Advances adjustments
3
Vendor performance tracking
Follow up with vendor for ...
1 Opening(s)
5.0 Year(s) To 6.0 Year(s)
5.00 LPA TO 6.00 LPA
Job Description
Project Name RE-60 MAXIMA
Department: TOOL ROOM
Designation: ENGINEER
EXP. REQ. 5 - 6 YRS
Qualification: DIPLOMA
Place: -3K Aurangabad
Job Skill required:
1 KNOWLEDGE ABOUT TPM, ISO, OHSAS & IATF.
2 KNOWLEDGE ABOUT VIBRATION, WELDING FIXTURE MAINTENANCE.
3 KNOWLEDGE ABOUT INJECTION MOULDING.
Roles and responsibilities:
1 To follow the instructions given by respective HOD.
2 Maintain mould history card & ...
1 Opening(s)
6.0 Year(s) To 11.0 Year(s)
6.00 LPA TO 7.00 LPA
Company Profile: Established largest distillery in Maharashtra, started molasses base production in the month of December-2008, having manufacturing capacity of 1.20kl/per day with modern technology and advanced plant and machinery with latest technology and atomization PLC, SCDA. DCS etc systems and having our own 3 MW thermal /co-generation captive power plant, ...
1 Opening(s)
1.0 Year(s) To 4.0 Year(s)
2.50 LPA TO 3.50 LPA
Academic Requirements:
A completed graduate degree in engineering (Mechanical/Electronics/Robotics/Mechatronics/Electrical) is preferred.
A completed post graduate degree related to Materials Management / Supply Chain Management is preferred.
Work Experience:
1-4 years (Procurement related).
Required Skills:
Post-graduation in Supply Chain Management, in PGDSCM.
Work experience:
Good knowledge of Sourcing and quality check processes.
Extensive knowledge of mechanics of materials and material ...
15 Opening(s)
1.0 Year(s) To 5.0 Year(s)
1.80 LPA TO 2.50 LPA
Hiring for VTL Operator in manufacturing Group
Company Profile : Company was founded in 1983 and is India's largest and most reputed manufacturer of Electrical Steel Laminations, Motor Cores, Sub-Assemblies, Die-Cast Rotors and Press Tools. We have already diversified into manufacturing of Castings, Steel Fabricated Parts and machined components stator and rotor ...
4 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 2.40 LPA
5th Axis & 4th Axis CNC Machines, VTL,VMC & HMC (AMS, MAZAK 6800 & 4000, MAKINO a88 & a81, BFW maxpro H630) controll of Fanuc professional 5 & Mazatrol.
Knowledge of various tools & tool setting in shrinkfit machine & checking in tool precetor (zoller).
Introduce of new tools for reducing cycle ...
1 Opening(s)
4.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.00 LPA
SAP , Taxation, Billing, Costing
Carried out self project activities along with assisting ongoing Auditing activities like MIS, Income Tax, Sales Tax, TDS Working, Stock Statement, Bank, Vendor Reco, Vendor Payment, Receipt Booking, Capex Flow, Capitaltion Excise Working & Return, All Gov.Taxes Working & Payments, Cash Transactions etc.Proficiency in managing financial ...
1 Opening(s)
1.0 Year(s) To 2.0 Year(s)
1.60 LPA TO 1.80 LPA
Job Description
Ensuring the quality of product is consistent with the companyÂ’s policy requirement & is in accordance with applicable standards & clientÂ’s specification.
Daily ensures the 3rd party inspections & certifications as per customer requirement for RM, WIP, & FG etc.
Process Audits and Checks (Internal Quality Audit).
Initiating new product development and ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 4.00 LPA
Experience of teaching & programming an ABB, Panasonic robot.
Trouble-shooting & modification of Allen-Bradley Control Logix PLC programs, Mitsubishi PLC program.
Good knowledge of Allen- Bradley PLC5, SLC.
Working on servo motor and it's drive (Mitsubishi servo system).
Modification in electrical panel and PLC programs for eliminate the breakdown.
Looking over all the maintenance robots, ...