1 Opening(s)
10.0 Year(s) To 18.0 Year(s)
8.00 LPA TO 10.00 LPA
Reduced rework percentage by taking in-process audit and mfg. audit.
Work as per the guideline of TPM/TS
Development and mfg. jig and fixture and establishment for production
Decided optimum cycle time for hydraulic and pneumatic testing
Co-Ordinate with PPC department for smooth production running
Set the robotic line as per the targets and balance the bottle neck operation
Overcome all the minor abnormality related to fixture during trial.
Set the TPM target for quality, maintenance, stores and production.
Arrange for all resources including raw materials, man power and facility required.
Handling overall press shop production for daily production targets
Overall responsibility of welding sub assembly of floor board and running board assembly
PROCESS follows with safety and through with safety and work permits.
Achieving the planned targets without Compromising the quality and quantity
Working as per various standards like ISO9001&Tsi6949-2002 system
Preparation of daily & Monthly reports
Co-Coordinating with Stores, QC, QA, Maint .In day to day activity
Awareness of seven QC tools to improve quality problems
Handling 4M for achieve desired production targets
Job Location : Waluj MIDC Aurangabad
For more details call on 9765567509
2 Opening(s)
6.0 Year(s) To 8.0 Year(s)
7.00 LPA TO 10.00 LPA
PROFESSIONAL PROFILE: -
Management of all activities within the Machine Shop and all other related operations of the company.
Plan & schedule all shop activities for timely completion of customer req.
Conducting daily production meeting and Co-ordination among various departments for timely completion of production schedules.
Conceptualize and implement strict measures in operating procedures and equipments to optimize resource – Man, Machine, Method, Material /Capacity utilization.
Providing strong leadership to the employees at the plants, ensuring high morale, team work and good employee relations at all levels.
Working on Process bottlenecks, plan B & plan C to improve the plant performance
Effective implementation of systems are of 5S, TPM-JH,KK,QM,PM, Safety, SOP’s, DMR, SAP, ISO/TS 16949, etc.
Actions, analyse & monitor for non conformance by root cause analysis & elimination through ABC analysis, why-why (6W2H), fault tree analysis and various QC tools.
Active participation in developing the new components for process selection, process parameters, selection of tool & tooling’s w.r.t. quality & customer requirements.
Process & manufacturing cost reduction by analysis & actions on losses, wastages(MUDAS), improvement in Takt time & implementing the concepts of Lean, TPM, Kaizen, Pokayoke, 5S, Single piece flow, Automation, etc.
Establish implement and maintain quality system and other documentation required as per ISO/TS 16949.
Lead the implementation of new manufacturing initiatives, including strategic resource allocation and applying good manufacturing principles, organization structure, leadership, sourcing and integration, production systems and techniques for improved efficiencies and adherence to best practice.
New Product Development /Vendor Up gradation in line of new business development for the Organization.
Monitor and improve the results, goal setting & improvements by PQCDSM.
Small group activities - instrumental in promotion of small group activities like problem solving, continuous improvement, Mistake proofing, safety, productivity improvement, TPM and circle teams.
Implementing the concepts of “Visual Shop Floor” by 5S, with complete change in “Before & After” conditions by PQCDSM & DMR.
FUNCTIONAL STRENGTHS: -
Production Management & OptimizationStrategic Planning
Process up gradation & Cost ReductionTechnical analytic & background
Quality Management & System up gradation
Production Planning & ControlBottlenecks analysis & Actions to remove
New Product Implementation Gear Cutting – Hobbing, Shaping, Shaving & Machining
MACHINES INCLUDED: -
Hobbing Machines: Conventional & CNC (Liebherr, Mitsubishi, Pfauter, Gleason)
Shaping Machines: Conventional & CNC (Internal & External, WS1, Lorenz, etc).
Shaving Machines: Conventional & CNC (Sicmat, Hurth, Redring, Nachi, Mitsubishi)
ID Honing Machines: Horizontal & Vertical (Nagel)
Gear Tooth Chamfering Machines
CNC Turning, F & C, VMC, Hard Turning – Mild Steel & Castings
Grinding machines: ID and OD
Laser Marking machine
Gear Testing Instruments
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 2.60 LPA
About the responsibilities of the position: The main activity of the production supervisor is that he is responsible for all the shop flower activities as peer following job profile. .
Reporting to: Manager
Repartees to this position: Production Engineer
Educational Qualifications: Bachelor of Engineering in the stream of Mechanical / Production. Or ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
25.00 LPA TO 30.00 LPA
AGM / DGM – Paint Shop Production
Position Overview
Role: AGM / DGM – Paint Shop Production
Industry: Automotive Components Manufacturing
Location: Waluj MIDC Chh Sambhaji Nagar
Budget: Up to 30 LPA (Commensurate with experience)
Experience: 15 to 25 years in automotive paint shop operations
Core Responsibilities
Production Management: Oversee daily paint shop operations to meet volume targets ...
1 Opening(s)
8.0 Year(s) To 14.0 Year(s)
9.00 LPA TO 10.00 LPA
Scheduling & Routing: Develop daily, weekly, and monthly production schedules based on customer purchase orders and Bill of Materials (BOM). Plan optimal routing for corrugation, printing (flexo), die-cutting, and stitching/gluing lines.
Job Card & Print Order Management: Initiate job cards, verify specifications, allocate tasks to specific machines, and issue print orders ...
1 Opening(s)
8.0 Year(s) To 14.0 Year(s)
9.00 LPA TO 10.00 LPA
Scheduling & Routing: Develop daily, weekly, and monthly production schedules based on customer purchase orders and Bill of Materials (BOM). Plan optimal routing for corrugation, printing (flexo), die-cutting, and stitching/gluing lines.
Job Card & Print Order Management: Initiate job cards, verify specifications, allocate tasks to specific machines, and issue print orders ...
10 Opening(s)
0 To 0
3.00 LPA TO 3.00 LPA
A Graduate Engineer Trainee (GET) in Production at a Waluj, Chhatrapati Sambhaji Nagar facility oversees shop-floor fabrication, press machine operations, and component quality. Responsibilities include shift supervision, maintaining production targets, reading mechanical blueprints, and ensuring strict adherence to safety and quality protocols.
Typical core responsibilities for this role include:
Shop-Floor Operations: ...
3 Opening(s)
3.0 Year(s) To 6.0 Year(s)
4.00 LPA TO 5.00 LPA
The Painting Production Shift Engineer is responsible for managing and supervising painting operations for cast components during the assigned shift. The role ensures that surface preparation, coating application, curing, and quality checks are performed efficiently while meeting production targets and quality standards.
Key Responsibilities
Production Supervision- Manage painting operations for castings during ...
2 Opening(s)
20.0 Year(s) To 25.0 Year(s)
15.00 LPA TO 20.00 LPA
Position Title : Senior Manager Lamination Progressive Tools Servicing
Position Reporting To : Plant Head
Work Location: Kothur_ Hyderabad (1 Position) & Aurangabad (1 Position)
Function Operation.
Department Tool Service
Primary Role
Heading for Tool Manufacturing & Tool Serving of Laminations Punching Blanking / Compound Press tools / Progressive Tools / Notching tools ...
2 Opening(s)
3.0 Year(s) To 4.0 Year(s)
4.00 LPA TO 6.00 LPA
We are looking for two results-oriented professionals to join our Production Department. You will be responsible for overseeing the daily forging operations, managing shop floor personnel, and implementing lean methodologies to optimize output and maintain high-quality standards.
Key Responsibilities:
Production Management: Lead daily shifts in the forging shop to ensure production ...