1 Opening(s)
3.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 3.50 LPA
JOB TITLE:
Lab Assistant
POSITION:
Executive
DEPARTMENT:
Production
BAND:
6B
REPORTS TO:
Functional Reporting: Manager – Operations
Administrative Reporting: Sr. Manager - Operations
Compensation:
2.50 lacs pa to 3.50 lacs pa. Plus accommodation reimbursement as per actual rent agreement (maximum Rs 3000/- per month). Plus Group Mediclaim / Personal Accident Policy as per Company norms. )
Work experience:
4-8 yrs
Education:
B.SC – Wine Technology / ...
1 Opening(s)
1.0 Year(s) To 3.0 Year(s)
1.68 LPA TO 3.00 LPA
Designation in Organization: - PPC Engineer (Production Planning & Control)
Education: BE Electrical or Electronic / Electrical / Mechanical
Gender: Male
Responsibilities & Authority:
•Capacity Planning for production of particular Shop Floor
•To Monitor & do the production planning according to the customer schedule
•To Monitor the Raw Material availability as per planning
•To Monitor monthly & weakly production planning
•To co-ordinate with stores and purchase dept. and ensure availability of raw material required to achieve dispatch plan.
•To co-ordinate with design dept. and ensure updated documents are made available for production on the shop floor
•To co-ordinate with PED to ensure that all circuit testing boards and final assembly boards are timely validated and made available as per production plan.
•To prepare the dispatch plan as per customer schedule.
•To release the dispatch plan to production dept.
•To ensure that a viable production plan has been prepared by the production team in accordance with a dispatch plan
•To release a kitting plan to the store's department in accordance with the production plan.
•To communicate with marketing dept. if any changes are made in the production plan that could affect the planned dispatch date.
•To communicate with the design department about the output of the process feasibility analysis conducted by production dept. so that changes, if required, can be made in documents to be issued to production.
•To maintain the record of the date and production order from which each change in engineering specifications is implemented in production.
•To release current mod list to production and quality dept. after every MIN Meeting conducted by design dept.
•To release production orders in SAP as per plan and provide a cutting label for production.
•To ensure timely confirmation of production in SAP.
•To ensure that FG stocks in BSR coincide with that in SAP system.
•To communicate to all concerned dept. ( Prod, Mkt and QA) regarding packed quantity on a daily basis
•To ensure that packing of FG is done within shift time.
•To ensure that daily production data update on display board and also update it in softcopy.
•To Monitor & do measurement Of Production Objectives
•To Work in PP & MM module of SAP
•To Maintain the stock in SAP
•To Match the physical raw material stock & SAP stock
•Play an important role in WIP (STOCK) as coordinator for production & account dept.
•Monitor Schedule Vs. Compliance of production
•To take responsibility as an associate member in KK pillar.
•Monitoring Daily Attendance & data of operator, also coordinate with HR dept. for the same.
•OEE monitoring.
•Plan v/s Actual monitoring.
•Scrap monitoring.
•Monitoring TPM activity of production department.
•Monitoring ISO & TS activity of production department.
•To coordinate with purchase, Store & account dept. for new material requirement
•To communicate with supervisors & line leaders of the respective section (ACC, LPC, ASSEMBLY)
•To maintain KAIZEN & coordinate with QMS Dept. for the same
•To prepare MRM Presentation
•To make stage wise identification
Job Location: Shendra MIDC, Aurangabad
for more details call on 7249840222 / 9765567505
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 4.00 LPA
Post: Senior Quality Engineer
Education: BE Electrical & Electronic
Experience: Min 3 Years
Responsibilities:
•Provide requisite Customer Support on Quality Issues, Visit Customers, interact and capture vital issues and collaborate with internal team for Action implementation.
•Present the Action plan Implementation data to Customer through a presentation like Improvement Action Plan, Manufacturing Quality Verification etc.
•Preparation of Customer as well as Internal PPM Trend & present the MIS report.
•Submitting CAR in Customer required formats & online submission on Customer Portal.
•To carry out the PPAP activity for newly developed products.
•Review of PFMEA & Control Plan and highlight improvement points.
•To make inspection standards, visual aids, SOPs, Quality Alerts.
•Conduct Product Audit / Process Audit & Internal QMS Audit of various processes.
•Train new and existing team members on an ongoing basis on relevant tools or topics.
•Ensure adherence to targets set for all process metrics, KPI data.
•Support organization in regulatory compliance and internal audits.
•Support the team to maintain/control documents and procedures in the document management system.
•Lead & Drive the different Kaizen projects and its sustenance
Customer Quality
•SPOC for Customer - Quality issues/complaints/queries, CAPA submission & Improvement aspects.
•Setting up procedure & format for Customer Complaint Data Collection.
•CRM- Automotive OEM Customers like Bajaj, Piaggio, Royal Enfield, John Deere etc.
In-process & Final Quality
•Lead team of QC Engineers - Supervise the Final Testing & Inspection activities.
•Well versed with a manufacturing process of Wiring Harness etc.
•Setting up procedure & format for testing & Inspection activities.
•Quality Audit including Product Audit, Process Audit & Monitor cost of quality & In-House Rejection.
•Heading the Cost Saving /VALVE projects.
Quality Management System
•Assist to MR in an Internal Auditing program.
•Qualified ISO/TS: 16949 internal auditors.
•Auditing processes as per QMS requirement.
A span of Management Control
•Leading a diverse team of 20+ employees.
•Allocation of work among the team and track for completion within an allocated time frame.
•Team Building with motivational training to new Operators, Team Leaders, Supervisors, and Inspectors.
Job Location: Shendra MIDC, Aurangabad
Bus canteen facility available
for more details call on 7249840222
1 Opening(s)
6.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
Post: Maintenance Shift In charge
Education: DEE / BE Electrical
Experience: Min 6 Years in Rolling Mill / Steel Industry
Job Profile: Working in a general shift, make daily job planning, manpower planning as per rolling section.
Responsible for doing pm-1(preventive maintenance) jobs .shift schedule and daily checklist follow-up,
Responsible for Electrical & Automation Maintenance of 600-meter long HAPL Line consist of Entry section, RCM Welder,6-HI Cold / Hot Rolling Mill, Furnace, Scale Breaker, Shot- Blaster, Pickling, Entry-Mill & Exit Loppers & exit Section.
Responsible for handling all maintenance related activities of ABB PLC's,AC Drives,AC Motors and DCS 800xA System and LT and HT switch Gears used in the plant
Knowledge in logic solving in control panels & various interlocking schemes required for automation and analyzing all drawings related to automation & control systems.
Instrumental in coordinating with various internal departments and contractor personnel for safe execution of shutdowns and ensuring implementation of routine/preventive/breakdown maintenance schedules of the system to increase machine uptime, equipment reliability thereby.
Responsible for maintaining 5S activity & safety measures regularly
To co-ordinate with the Electrical contractor for Execution, Erection, and Commissioning
Basic Knowledge of Sheet CENTER GUIDE and STEERING UNIT, EDGE System provided by EMG.
Knowledge of hardware Communication between Drives, PLC and HMI’s through Fiber Optic and Profibus.
Knowledge of Gauge Measurement system provided by IMS used at 6 HI in Line Mill.
Responsible for keeping a record of the daily power consumption, daily delay report, spare parts list of the plant.
Basic Knowledge about Control-Logix / Compact-Logix systems of Allen-Bradley PLC (Rockwell Automation).
Identifying NetLinx networks for use in a Logix5000 System used for in-line Welder.
Successfully accomplished Erection, testing, Commissioning of ARP System(Acid Recovery Process
To maintain records, logbook for the job carried out.
Organize safety meetings & give on the Job training to my subordinates
To ensure good housekeeping in the area and the shop floor.
Take participate in IMS internal audit and prepare all supporting document
To maintain a record of bypass of trip & interlock as per the procedures.
Working on SAP (Plant Maintenance Module).
Job Location: Chitegaon MIDC, Aurangabad Maharashtra
For more details call on 7249840333 / 9765567506
Send CV on career@paradiseplacement.co.in
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 9.00 LPA
Post: Production Manager
Education: BE / Diploma
Experience: Min 7 Years
Salary: up to 9 LPA
Company Profile: endeavors to Packaging that stands out of the rest, as an example of excellence. From Paper to Boxes, our expertise encompasses the entire range of Corrugated Packaging. Uncompromising quality and commitment to customer satisfaction are the prime movers. With 25 ...
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 12.00 LPA
Job profile: Excise Manager
Functional Area: Order processing, dispatch & logistics control, excise, DGFT and customs matters, License/approvals, inventory and warehouse matters and Accounts handling, documentation, and MIS Candidate profile Min. 7 years experience with a degree in Commerce. Candidate should have
Roles and responsibilities Responsible for matters related to ordering processing, dispatch, ...
7 Opening(s)
2.0 Year(s) To 4.0 Year(s)
1.80 LPA TO 3.00 LPA
Post :
QA Engineer In Process - 04
QA Engineer Inward - 03
Education: BE/ Dip (Mech)
Experience: 2-4 years
Keywords: Fabrication / Weld Shop department experience candidates should be preferred
Job Profile
QA Engineer Inward
Conducting Process Audit, Product Audit, Supplier Audit as per plan.
Monitoring & reviewing the SPC study, process FMEA and MSA study on monthly basis.
Control of documents and records as stipulated in quality system procedures includes the issue of controlled copies.
Monitoring In-Ward & Final Inspection.
1st piece in process inspection report & taking C.A. if any.
In handling customer complaints and their solutions.
To maintaining quality related document calibration report, Inspection report and etc.
To take follow up on supplier corrective action reports.
Preparing the control plan of In-Ward, Final& In-Process component.
Preparing PPAP, PFMEA for new development components
QA Engineer In Process
Monitoring of special processes (Welding).
Monitor & Handle Customer feedbacks & complaints.
Handle all type of gauges and ...
2 Opening(s)
0 To 1.0 Year(s)
1.44 LPA TO 1.68 LPA
Hiring for "Engineer-Production Planning & Control" in Aurangabad Interview Date : 04-05 July 2018
Post : Engineer-Production Planning & Control
for Male/Female-02Area : Wire Hirness , CCVD (Cutting & Crimping Validation Department Which CES under)
Education: BE Electronics & Telecommunication/ MechanicalSalary: upto Rs. 14,000/-facility : Bus & Canteen available
Job Location : Shendra MIDC, Aurangabad
For more details call on 9765567506 ...
9 Opening(s)
2.0 Year(s) To 6.0 Year(s)
1.80 LPA TO 3.00 LPA
Interview Start from 6th June 2018
Post : Setter Supervisor or Associate Engineer
Company Profile : Crankshaft, Steering knuckle and front axle beam
Education : ITI / DME
Experience : 2 to 5 Years for DME & 7 to 12 Years for ITI
Number of Vacancy : 05
Salary : upto 3.00 Lac(s)
Job Profile:
CNC Programming of Fanuc Control System
VMC Programming of Fanuc ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
2.40 LPA TO 3.60 LPA
Roll :
Designing various electrical control panels like PLC, VFD, Soft Starter, MCC, PCC, Pneumatic, ETC Circuit designing, preparing SLD, Panel layout & Electrical schematics.
Making BOM, selection of material as per requirement or IP protection, preparing drawings for approval communicating with clients for understanding and detailing of drawings
Supporting to other teams ...