1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.30 LPA
KEY RESPONSIBILITY:
Maintenance activities of hydraulics/ Robotics/electric & Mechatronic
Maintenance of injection molding machine & SPM machine
Execution of PM & PDM as per schedule, Analysis of breakdowns
Execution of TPM &PM pillar Activities
Energy saving project
Attending major breakdown maintenance
Utility includes transformer, HT/LT switchgear, Air Compressor, DG set, pump house Head over crane, chiller, cooling tower, lux measurement. Firefighting system, R.o plant
Handling documentation of executive & planned maintenance
Execution of TBM CBM as per schedule
Study of detoriotive components
Applications of kaizen
Troubleshooting and attending breakdown maintenance
Housekeeping maintenance related to department modification and spare management
Implementing ISO/TS16949, 5’s and FORMELQ
To improve machine uptime (MTBF)
To improve machine repairs time (MTTR)
Maintained machine history card
To handle electrical supply system I.e.HT &Lt side
Maintenance of hydraulic system/ pneumatic system/ to develop ladder logic of PLC, AC, DC & Servo Drive
Keeping spare in ready operational condition and maintenance of utility equipment
Preparing Machine Check List: sm 450t, sm 350, Magna150t, Magna 200t, htw90, htw60 & FOR 50TH machine
Capable of handling electromechanical device Is. robot, chiller, ultrasonic welding m/c
Presentation of monthly PRM
Taking outside service appointment & spare management
Recording Daily Activity Report for Meter Reading (main transformer, all panel) &Organize receivable &commercial
Documents against invoice
Managing maintenance of machine control panel, assembly line, plant lighting, street lighting, & all electrical work in plant as well as of communication buses RS232, RS485, DH485&Modbus
Working on welding machine, grinding machine, oil filter machine water chiller, rivet gun, hydraulic pneumatic machine, DG set, exhausts fan & dehumidifier, injection model and plastic mold
Job Location : Waluj MIDC, Aurangabad
For more details call on 9765567506
1 Opening(s)
8.0 Year(s) To 14.0 Year(s)
6.00 LPA TO 7.00 LPA
Maintenance Activities
As a Maintenance Executive (HOD) representative to Plant head (GM)
Maintenance of Plastic injection molding press ,assembly machines, utility machines,tool room machines
Responsible for breakdown targets ,PM planning and execution.
Spare part planning with critical spare and inventory control .
Preparation of maintenance budget with annual shutdown plan budget.
Monitor and control utility operation and its maintenance and ...
1 Opening(s)
2.0 Year(s) To 4.0 Year(s)
2.40 LPA TO 3.60 LPA
Department: MOULD PRODUCTION
Place: BAPL 3K Aurangabad
Designation: Jr. Engineer
Qualification: BE/DME
Job Skill required:
1 Basic Knowledge of Injection Moulding Process.
2 Knowledge Of Polymer Material.
3 Basic Knowledge of Machine And Mould Maintenance.
4 Knowledge of post molding operations.
5 Knowledge of assembly line handling
6 Knowledge of JH
7 Process Optimization
Roles and responsibilities:
1 Stage wise/cell wise man power ...
1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 7.00 LPA
Designation: Senior Engineer (Male or Female)
Education: BE/DME
Experience : 7-8 years
Job Skill required:
1 Person should be aware & practice IATF 16949 / TPM, QMS System.
2 Well Knowledge about PPAP & DR Documentation.
3 Should be aware about PFMEA, FMEA, QA & QM Matrix, and Control Plan.
4 Best analytical ability
5 Very ...
3 Opening(s)
2.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 5.00 LPA
Position - Engineer / Sr. Engineer
Openings - 3 No.
Department - Engineering Development Center(EDC)
Experience - 2-6 yrs Experience in Sheet Metal Development
Education - BE-Mechanical/ DME
Job Location - Aurangabad
Knowledge & Skills –
1.Need to sign 3 years of Service bond
2.Minimum 2-6 years of experience in sheet metal & stamping assemblies, welding fixtures & ...
1 Opening(s)
7.0 Year(s) To 15.0 Year(s)
3.80 LPA TO 4.50 LPA
Job Description
Daily production planning and target achieving as per plan.
Manpower handling solving customer complaint.
Daily model wise production planning.
Daily rejection analysis and root cause action report making and preparation of CAPA for any assembly defect.
Involve in implementation of kaizen at work station.
Familier with co2 ,spm and robotics welding, seam welding
Daily meeting ...
4 Opening(s)
1.0 Year(s) To 3.0 Year(s)
2.00 LPA TO 3.00 LPA
Post :
Production Engineer 02 (Press Shop)
Production Engineer 02 (Weld Shop)
JD :
Sound knowledge of Press Shop
Sound knowledge of Weld Shop
Production planning of Stamping & Welded Assembly’s as per customer scheduled (Daily/weekly/Monthly).
Manpower planning as per production plan in each shift.
Gives trainings to shop floor operators for improve multiskilling for production.
Plan & Conduct ...
2 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Daily production planning and target achieving as per plan.
Manpower handling solving customer complaint.
Daily model wise production planning.
Daily rejection analysis and root cause action report making and preparation of CAPA for any assembly defect.
Involve in implementation of kaizen at work station.
Familier with co2 ,spm and robotics welding, seam welding
Daily meeting taking ...
1 Opening(s)
2.0 Year(s) To 3.0 Year(s)
2.40 LPA TO 3.60 LPA
Adept at handling day to day activities in co-ordination with internal /external departments for ensuring smooth Production operations.
Experience in updating data to maintain departmental records and database.
Experience in managing production operation with key focus on the optimal utilization of the resources.
Implementing quality standards & Internal control plans for manufacturing operations ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
7.00 LPA TO 10.00 LPA
Development of New Products from Drawing to Stream Line Production.
Drawing Study & Feasibility study.
Design of Process Flow for assembly as well as loose parts.
Budget preparation & approval from management for New Projects
Project Planning, Machinery & Tools planning for new Project
Preparation of PFMEA & Control Plan
Vendor identification & Enquiry of quotations for Press Tools, Fixtures & Gauges
Tool costing & cost finalization with supplier
Design, concept discussion & approval for press tool , Fixtures & Gauges
Manufacturing schedule & Development plan for the tools & Fixtures
Floor plan layout & material handling plan
Operation sheets D.R. documents (PPAP) discussion & submission to the customer (Bajaj Auto Ltd.)
Physical tooling status, review & Conduct Trials for press tools, Fixtures & SPMs
SIR preparation, correction & approval from Customer
Preparation of Prepilot, Pilot batch & production trial run
In house production line layout as per floor plan
Mass production run
Final Process details hand over to the Production
Time study & Line Balancing
Skill : Press Shop Sheet Metal Product Delevement ,
Job Location : Waluj , Aurangabad
For more details call on 9765567699